perma MINI

Want to see a sample of our electrochemical (gas) units in action?  Try a perma MINI.  20cc quantity filled with a lubricant or hand lotion, discharged in one day or one month. 

Application Images

FROST - Installation and Operation

 
Installation & Servicing Tips
1.
Always ensure that newly installed bearings are pre-packed prior to installing lubricator.
2.
Pre-lubricate bearings using a grease gun to ensure that the point can receive grease freely.  Clean all fittings to prevent contamination.
3.
Select the appropriate dispensing rate to suit each application.
4.
Decide whether to direct or remote mount depending on access and safety considerations.  When remote mounting, do not exceed the recommended line dimensions.
5.
Activate the lubricator prior to installation by fully inserting the activation screw.  When the activator becomes hand tight, take a screw driver and insert it through the top ring of the activator.  Continue to tighten until the O-ring breaks off.  DO NOT break ring off by hand.
6.
Write the installation and replacement dates on the lubricator and record the dates in the site maintenance scheduling system or keep a separate record.
7.
Screw the lubricator into the grease port by hand - tools are not necessary.
8.
Once installed the lubricator should be periodically inspected to check that accidental damage has not occurred.
9.
Change-out lubricator on the planned date.
10.
When changing-out empty lubricators, manually purge the bearing to ensure the lubrication conditions have not changed.
 

Search

Operating Instructions

You may download the updated operating instructions from our Downloads page.

Downloads

SELECT Software

Calculate lubricant dischart amount and time by using the free-of-charge SELECT software.

Downloads