|
PRO MP-6 - Installation and Operation
|
|
Installation & Servicing Tips
|
|
1.
|
Ensure that newly installed bearings are pre-packed with grease
|
|
2.
|
Pre-grease bearings prior to installation using a manual grease gun to ensure that the grease point can freely receive grease. Clean all fittings prior to greasing.
|
|
3.
|
Select proper LV size and distribution rate for application.
|
|
4.
|
Assemble and setup lubricator, including accessories, according to instruction manual (if necessary).
|
|
5.
|
Once installed, the lubricator should be periodically observed to check that accidental damage has not occurred. Inspect the LED lights and display screen. If remote mounted, check lines.
|
|
All PRO MP-6 orders come with a complete installation kit, which includes:
|
|
1 perma PRO drive unit
|
Pre-assembled
|
|
1 perma PRO protection cover
|
|
1 250cc / 500cc LV unit (filled with lubricant)
|
|
1 Battery Pack (installed in drive unit)
|
|
1 MP-6 distribution block
|
|
1 MP-6 data cable
|
|
1 B-808 - PRO / MP-6 mounting bracket
|
|
1 B-807 - PRO mounting bracket bolts and washers
|
|
2 A-710 Kit - 1" beam clamp (includes fasteners)
|
Other included parts/accessories
|
|
6 B-801 - 5/16"T x 1/8"MBSPP tube connector (straight)
|
|
6 B-802 - 5/16"T x 1/8"MBSPP tube connector (90 degree)
|
|
6 B-803 - 5/16"T x 1/8"MNPT tube connector (straight)
|
|
6 B-804 - 5/16"T x 1/4"MNPT tube connector (straight)
|
|
4 B-806 - MP-6 port plugs (for non-active ports)
|
|
100ft B-810 - 5/16" tubing (pre-filled)
|
|
LED
|
Signal
|
Signal Length
|
Explanation
|
|
green
|
flash
|
every 10 seconds
|
normal operation
|
|
red
|
flash
|
every 3 seconds
|
error / malfunction
|
|
green and red
|
flash
|
every 3 seconds
|
LC-unit empty
|
|
green
|
light
|
permanently
|
lubricator is discharging
|
|
green and red
|
none
|
none
|
lubricator switched off or battery low
|
|
Troubleshooting Guidelines
|
|
Error code
|
Malfunction
|
Possible cause
|
Corrective action
|
|
E0
|
Lubrication system has been switched off
|
Excess motor current of the perma MP-6
|
Replace perma MP-6 distributor
|
|
F1 to F6
|
Error at the displayed lubrication point
|
Excess motor current of the lubricator motor caused by a blocking of the displayed outlet
|
Clear the blockage and acknowledge the fault by pushing and holding down the ON/OFF/SELECT or SELECT button
|
|
E2
|
Lubrication system has been switched off
|
Outlets of distributor not correctly recognized
|
Replace distributor
|
|
E3
|
Lubrication system has been switched off
|
Timeout while activating distributor. Connection cable damaged.
|
Replace distributor. Replace connection cable.
|
|
E4
|
Lubrication system has been switched off
|
Drive mechanism of the lubricator is defective
|
Replace the drive unit of the lubricator
|
|
E5
|
Outlet configuration missing
|
Outlets were not activated
|
Activate desired outlets
|
|
LC
|
Lubrication system does not detect the PRO LC unit
|
No PRO LC unit installed
|
Install a PRO LC unit (observe the operating instructions of the lubricator)
|
|
L0
|
No power supplied to the lubrication system
|
No power supplied to the lubricator
|
Establish a power supply (observe the operating instructions of the lubricator)
|
|
Use flexible lines which are no more than 15 feet long and have an internal diameter of at 3/8". Smaller diameter lines present increased resistance to grease flow. Before installing, always prime grease lines and pre-grease bearings. Minimize small orifice restrictions and ensure that the bearing will freely receive grease.
|
|
|
|
|
A single PRO MP-6 in a quarry application
|
Dual PRO MP-6 enclosure installed on drilling equipment
|
|